PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor bathroom rough Facing North.jpg Connecting copper piping to the 3rd floor VAV Boxes Facing North.jpg Erecting stone panels at the 2nd floor roof East Elevation.jpg Installing black iron duct work at the 4th floor Facing East.jpg
Previous pageNext page Erecting stone panels at the 2nd floor roof East Elevation
Erecting stone panels at the 2nd floor roof East Elevation